Showing posts with label evaporator. Show all posts
Showing posts with label evaporator. Show all posts

Tuesday, 11 June 2013

Design Procedure for Standard Vertical Short Tube Evaporator

Design Procedure for Standard Vertical Short Tube Evaporator

    1)Design of Calendria :-

 Number of tubes(n) =
 Heat transfer area / Tube area
 Here, tube area = π x outside tube dia. x effective tube  length

Area occupied by ‘n’ tubes ( A )
 = n x (ST )2  (for square pitch)
     =  n x 0.866 (ST )2  (for triangular pitch)
Here ST  is the pitch of tube.
     Also, Area (A) = an

The area occupied by the central downtake is considered to be 40% of the cross sectional area of tubes, Ai
= 0.4 x No. of tubes x cross sectional flow area of a single tube( π/4 x Di 2 ) & Di  = DO – 2t  
Here t = tube thickness

The inside diameter, di , is then obtained as :-
di  = ( 4 x A / π )1/2

Outside diameter of downtake(do ) = di  + 2 x 10

The area of downtake based on outside diameter (Ao )
= π/4 x do 2

Therefore, the total area occupied by downtake and tubes =
area of tubes + area of downtake

 Therefore, Diameter of tubesheet, DT , is calculated as,

                                 DT  = ( 4 x Ao / π  )
Where DT  must be in mm.

    2) Calendria Sheet Thickness :-

 ts = (PDT / 2fJ – P) + c

If steam pressure or working pressure is given then multiply it with 1.1 , then we get design pressure.
P   = Design Pressure
DT   = Diameter of tubesheet as calculated above
f    = Allowable stress
J    = Joint efficiency = 1
The calculated value of ‘ts’ after adding corrosion allowance must be greater than 10mm,if it is less than 10mm then take ts = 10mm.
    
    3)   The Tube Sheet Thickness :-

t = FG ( 0.25P/f )

F = ( k / 2+3k )1/2

K = ( Es ts (Do - ts ) ) / ( Et N tt (do - tt ) )
G = DT + 25
P   = Design Pressure
DT   = Diameter of tubesheet as calculated above
f    = Allowable stress          
    
    4)   Design of Evaporator or Vaccum Drum  :-

The diameter of the drum is considered to be the same as that calculated for Calendria i.e, DT   = Diameter of tubesheet = Diameter of the Drum
To see whether the diameter is adequate for entrainment separator,we calculate Rd factor as,
Rd = ( (V/A)  / 0.0172 x ( ρL - ρV / ρV)1/2 )

V = Volumetric flow rate
   = Amount of water evaporated/density of vapour

A = cross sectional area of the drum 
    = π/4 x DT 2 ( here DT should be in m  )

ρL  =  density of liquid

ρV  = density of vapour

Now,
if Rd = 0.5 then no Entrainment Seperator is required & 
if Rd = 1.3 then wire mesh as Entrainment Separator is used &
if Rd = 0.5 then the height of drum considered as the disengaging height is based on Drum Diameter.

   5)   Drum Thickness :- The drum is under vaccum. The outside pressure is atmospheric . Therefore for the design purpose the drum is subjected to external pressure of 0.1 N/mm2.Therefore we shall assume thickness t = 12mm and length of shell and calculate allowable stress.
   Pc = 2.42 E ( t / Do )5/2 /
    ( 1 - µ2 )3/4 ( ( L / Do) – 0.45 ( t / Do )1/2)

Then calculate Pall as,
Pall = Pc / factor of safety

Now, If Pall is less than external pressure of 0.1 N/mm2
then again calculate Pall taking t = 14mm and so on…
    
    6)   Compressive stress is calculated as :-
  
   fc = Pd/2t
t = for which t, Pall is greater than external pressure of 0.1 N/mm2.
If fc is less than the given allowable stress then our design is safe.
    
     7)   Conical Heads at Top and Bottom :-

Now take t = for which t, Pall is greater than external pressure of 0.1 N/mm2 & L / Do = 1 and calculate Pall as,
       
         Pc = 2.42 E ( t / Do )5/2 /
    ( 1 - µ2 )3/4 ( ( L / Do) – 0.45 ( t / Do )1/2)
     
Then calculate Pall as,
   
 Pall = Pc / factor of safety